Tuttle Hill

Camp Hill 3Camp Hill, Nuneaton 2002-2005

Axis acted as architectural and urban design consultants for Lovell Partnerships who won the competition to be involved in phase 1 of this Urban Villages Initiative.

The project, supported by the Princes Foundation, Advantage West Midlands, Touchstone Housing Association and Pride in Camphill involves the construction of 172 homes of mixed tenure including three storey townhouses and bungalow accommodation.

Continue reading “Tuttle Hill”

Egghill

Egghill Estate, Birmingham 2001—2003

Egghill masterplanAxis produced a masterplan for the rebuilding of the Egghill Estate in south Birmingham, an estate of 560 dwellings built in the 50s and 60s. Working from an office in an empty ground floor flat, Axis carried out consultation with residents which leading to an agreed masterplan for new dwellings, road layout, open space, and proposed commercial uses.

Continue reading “Egghill”

Castle Vale HAT

Castle Vale, Birmingham 1995—2002

Axis have worked on the Castle Vale estate since 1995 on a number of projects from area based, Neighbourhood Strategy consultative design to the detailed design of houses, flats and bungalows.

Sopwith Croft

On both the Sopwith Croft and Watton Green areas we worked from a locally based neighbourhood design office meeting with local residents on an almost daily basis as we formulated the plans for their local areas. In both neighbourhoods we worked from the basis of large scale physical models which evolved as the consultation process moved to a consensus.

Continue reading “Castle Vale HAT”

Pype Hayes Estate

Pype Hayes, Birmingham 1989– present

Pype Hayes consultation

The rebuilding of the Pype Hayes Estate in Birmingham is Axis’s longest-running job. It was a low-rise suburban council estate built in the 1930s, of about 1400 houses. Although the houses were of conventional appearance, they were built of an untested concrete panel system, and by the 1980s it was clear that total demolition was necessary. Axis were brought in by the residents’ action group to prepare an alternative plan, which soon was accepted in place of the official one.

Continue reading “Pype Hayes Estate”