Blurton Hub PV array

Blurton Hub, originally uploaded by axisdesign.

Construction of the community centre at the heart of our masterplan for Blurton in Stoke on Trent continues with the installation of a large photovoltaic array that will benefit from the Feed in Tariff.

The 8 kWp system will deliver signifcant daytime electrical load helping to power a 33kW ground based heat pump using five 110m bore holes mining for heat rather than coal.This significant community resource funded by Stoke City Council is part of a mixed used development with Aspire Housing Association.

Brandwood End Passive Solar

Today sees the official opening of the passive solar spaces we designed on behalf of Waterloo Housing for the latest phase of Brandwood End in Kings Heath. Thanks to funding assistance from Birmingham City Council we’ve been able to provide two storey glazed spaces to the rear of ten houses of mixed tenure. Designed as flexible spaces alongside the kitchen/dining room we believe that the life style benefits of sun spaces are equally as important as the energy/economic benefits.

Brandwood Passive Solar (1) Brandwood Passive Solar

Like our work in the refurbishment field, we’ll also be doing extensive post-occupancy monitoring of these properties over the next 3 years. We gave a short presentation at Ecobuild this year covering all these issues and the slides are available online.

visit ecoterrace phase 2

Works is progressing well with phase 2 of the ecoterrace project and like the previous properties we’ll be taking part in some open days for the public. Come along and visit us!

4+6 Victoria sun space 2

107/109 London Road,
Chesterton,
Newcastle Under Lyme,
ST5 7JE

Open days:

  • 7th March 10am-2pm
  • 14th March 10am-2pm

4/6 Victoria Street,
Chesterton,
Newcastle Under Lyme,
ST5 7EW

Open days:

  • 18 April 10am -2pm
  • 25 April 10 am -2pm

ecoterrace opening

The first two ecoterrace properties are now complete!

Bellamy at ecoterrace

91 London Road and 63 Booth Street were officially opened with the help of renowned ecologist David Bellamy. If you ‘d like to come along and visit the houses we’re having a number of open days during the next few weeks. Full details can be found on the project web site: ecoterrace.co.uk

ecoterrace open days

May 12th will see the official opening of the first two properties at a specially organised launch event. After that 63 Booth Street and 91 London Road are being opened for public viewing over several days in May 2008.

If you’d like to take a look and discuss the project with team members, feel free to visit us on one of the following dates:

91 London Road (map link) and 63 Booth Street (map link) will be open on the following days:

Saturday 17th May, 10am – 2pm
Tuesday 20th May, 10am – 3pm
Wednesday 21st May, 10m – 3pm
Tuesday 27th May, 10am – 3pm
Wednesday 28th May, 10am – 3pm
Saturday 31st May, 10am – 2pm

Eco-Homes-Open-Days-Ad

Queens Road progress

Here’s the latest image from our project in Stourbridge. This shot shows the way each of the properties has a slightly different relationship with the street, depending on the paving and the door position.

Queens Road - plot 4 queens road in progress

Construction should be completed soon. We’ve also submitted the project for a Building For Life award – we hope to get a gold standard result…

(more details on Rob’s blog: no2self.net)

ecoterrace.co.uk

For the last few months we’ve been working on a project to refurbish 6 terrace properties in Newcastle-Under-Lyme. We won the project after a competitive bid last summer and last week saw the launch of the public web site charting the progress of the work. We’ll be recording the project on the eocterrace web site using a number of blogging techniques such as a written diary, a phonecam blog, flickr images and del.icio.us links.

concept

section

http://ecoterrace.co.uk

The goal is to substantially increase the environmental performance of the properties and help take part in the progress of the national debate about the importance of improving the quality of the country’s existing housing stock.

One of the most interesting aspects of the project will be the post-occupancy monitoring work we will be completing in collaboration with the guys from Hockerton Housing Projects. In a couple of years time we will hopefully have something valuable to say about the actual results of some of the design techniques and products, as well as an understanding of what it’s like to live in a property like this.